Your cart
Close Alternative Icon
Close Icon

Facelift of Pirate Fashions Entrance

Arrow Thin Left Icon Arrow Thin Right Icon

Aye, aye I do spend a lot more effort on the inside of the building vs the outside. After 4 year at arrr new warehouse store, the front finally got a facelift.  After the wind battered the canvas top, the wasp ate away at the wooden guard railing and the sun faded the front banner.  So I put in a new steel guard rail, a metal awning, and made a new sign with arrr cnc machine.  

Comments on this post (1)

  • May 24, 2021
    Found your post interesting to read. I can’t wait to see your post soon. Good Luck with the upcoming update. This article is really very interesting and effective. While surfing on the net I came across the following amazing site https://boattoursjohnspass.com/pirate-cruise-st-pete-beach/. Do visit it guys.

    — Pirate Ship Cruise St. Pete Beach FL

Leave a comment